Duration: April 2000 – March 2003
The project concerns the Architectural, Static and Electro-mechanical study of a new building complex of the HLPAP S.A at the Rouf (Eleonas) district of Attika. The construction of the above project aims to house the services of parking, repair and maintenance of electric powered busses (trolleys) inside the building complex and the surrounding area as well as the services of administrative operations.
The transportation work study plays a major role in the configuration of the final proposal which will insure the optimal service of all the functions. The above mentionned study aims to insure: the maximum possible availiability of parking spaces for the trolleys, the creation and operation of vehicle cleaning, maintenance and painting zones and in general insuring a high level of functionality and transportation services in the depot area.
Role of TREDIT:
Design of a trolley terminal – depot:
– Design of parking areas
– Study of transport infrastructure within the maintenance and parking area of the trolleys
– Depot management study